Independent production job · not a ticket-time step
Wash, pick & stage the cold diner garnish plate
Prep components before service and replenish cold as needed. Completion creates ready plate mise, not a finished bowl; a ticket still portions the diner's cold plate.
- Run output
- 15 plates
- Hands-on
- 6m 00s
- Elapsed
- 6m 00s
One canonical run
Inputs → production → held output
Every quantity and duration belongs to the complete physical run shown here.
Wash, dry, pick & cut one 15-plate lotcold-prep · 6m 00s hands-on · 6m 00s elapsed
Lot state
gradual quality decayHold and replenish
Food Code cold-holding ceiling for TCS produce such as raw sprouts and cut leafy greens
fresh while the service is active
Quality-first demo boundary: remake each service rather than carrying tired sprouts and herbs. The restaurant's approved produce plan controls.
wash, dry, pick, cut, and stage a replacement component batch
Production unitManual prep station
One independently scheduled prep job.
Completion effectcreates inventory
Downstream trigger: par or forecast.
Downstream demand