Independent production job · not a ticket-time step
Cut phở bowl aromatics in small batches
Refresh from the observed phở pace: cut a small refill every few tickets, then portion it into bowls. This is neither slice-to-order nor a shift-long batch.
- Run output
- 8 bowl portions
- Hands-on
- 2m 40s
- Elapsed
- 2m 40s
One canonical run
Inputs → production → held output
Every quantity and duration belongs to the complete physical run shown here.
Slice one eight-bowl rail refillcold-prep · 2m 40s hands-on · 2m 40s elapsed
Lot state
sharp quality decayHold and replenish
cold rail ceiling; the modeled quality control below is stricter
use soon at this point
quality-first replacement boundary, not a food-safety shelf-life claim
about six minutes to cut and stage an eight-bowl rail refill from washed produce
Production unitManual prep station
One independently scheduled prep job.
Completion effectcreates inventory
Downstream trigger: par or forecast.
Downstream demand